To access this element change to forms mode OFF

Closed ATM View - AZ6529

EST00013PH1 – PROJECT NAME: DFTP - TRANCHE 2 FACILITIES – HEAD CONTRACT 1 – RAAF BASE LEARMONTH

Contact Details

GHD Pty Ltd - Attn: Tara Kay

:
0733163762

:

:
AZ6529
:
Department of Defence - DSRG
:
72100000 - Building construction and support and maintenance and repair services
:
18-Apr-2024 12:00 pm (ACT Local Time)
Show close time for other time zones
:
19-Mar-2024
:
WA
:
Expression of Interest

:
No
:
No
:
Yes
:
This is the first phase of a two phase selection process. The Commonwealth anticipates inviting no more than five (5) shortlisted Applicants to lodge a tender for the contractor's activities and the works.

:

The works include RAAF Base Learmonth, which is located on the northwest Cape peninsula of Western Australia, approximately 30 km south of Exmouth. The Base is used for training exercises and operational requirements, supporting land, air and sea operations.

HC1 - Defence Fuel Installation (Aviation) (DFI(A)) and a new Defence Fuel Installation (Ground) (DFI(G)) at RAAF Base Learmonth (WA)

The scope of the new DFI(A) includes the following: 

• New DFI(A) to provide additional 2 x 3ML of storage capacity using a cut and cover construction methodology, Quality Control Inspection tank, offloading and dispensing points, electrical control systems and support facilities;

• Improvement of DFI(A) fuel quality control facilities; and

• A facility building to support the expansion of the existing DFI(A), located to the east of the existing operational DFI(A). The facility is to provide a Control Room, Office, Fuel Quality Control Test Centre (laboratory), Crib and Amenities. 

The scope of the new DFI(G) includes the following: 

• Establishment of DFI(G) with a total of 60,000L of diesel stored across at least two below-ground storage tanks integrated with the existing Central Emergency Power Station (multiple storage tanks required for redundancy);

• Decommissioning and remediation of DFI(P) diesel tank; and

• Decommissioning and remediation of existing DFI(G).

 

:

Industry Briefing

An industry briefing will not be conducted. 

Building Code 2016

The Building Code 2016 does not apply.

WHS Accreditation Scheme

The WHS Accreditation Scheme pursuant to the Building and Construction Industry (Improving Productivity) Act 2016 (Cth) does apply.

Indigenous Procurement Policy

The Australian Government's new Indigenous Procurement Policy took effect on 1 July 2015.  If relevant, further information regarding the Indigenous Procurement Policy is provided in the Invitation to Register Interest. 

PWC Act

The works described in the Invitation to Register Interest are "public work" and, therefore, subject to section 18 of the Public Works Committee Act 1969 (Cth).

Links to Defence websites

https://www.defence.gov.au/about/locations-property/infrastructure-projects/defence-fuels-transformation-program

Evaluation Criteria

The evaluation criteria are described in the Invitation to Register Interest.

Minimum Form and Content Requirements 

The minimum form and content requirements are described in the Invitation to Register Interest.   

Conditions for Participation

The conditions for participation are described in the Invitation to Register Interest.

 

:

The conditions for participation are described in the Invitation to Register Interest.

:

The award date for the contract is anticipated to be in or about Dec-2024 to Jan-2025, with completion in or about Dec-2026 

Estimated Value (AUD):
From $80,000,000.00 to $110,000,000.00
:

AusTender at www.tenders.gov.au, in accordance with instructions in Request documentation

Contact Details

GHD Pty Ltd - Attn: Tara Kay

: 0733163762

: