EST02024 Victoria Barracks Melbourne Redevelopment – Notice to Industry – Managing Contractor (MCC-1 2003)

Contact Details

Project Manager / Contract Administrator

:
+61 3 9948 2000

:

:
AZ 6242
:
Department of Defence - DSRG
:
72130000 - General building construction
:
22-Jan-2020 12:00 pm (ACT Local Time)
Show close time for other time zones
:
28-Nov-2019
:
VIC
Melbourne
:
Notice

:
No
:
No
:
No

:

THIS IS A NOTICE

This is a notice to industry of the upcoming provision of Managing Contractor (MCC-1 2003) services for the Planning and Construction of site-wide high and medium risk infrastructure, and high use building services infrastructure works for EST02024 Victoria Barracks Melbourne Redevelopment Project (VBM).

The VBM scope of works includes:

  • Replacement of the Electrical Distribution Network Low Voltage and High Voltage
  • Potable water and stormwater drainage network
  • Gas network
  • Fuel and sewerage infrastructure
  • Replacement of the asphalt
  • Replacement of building services including;
    • Fire detection suppression and detection systems
    • Chilled Water, Heating and Hot Water systems 
    • Heating, Ventilation and Air Conditioning systems
  • Building refurbishment works 
    • Provide compliant working accommodation D Block and H Block.
:

THIS IS A NOTICE

The MC procurement will be single stage, where the successful applicant is appointed to plan the works in the Development Phase. The Development Phase includes all aspects of design, environmental, heritage, services condition and capacity investigations to support capital cost estimates for the Departmental, Government and Parliamentary Approvals, necessary to proceed to construct the works in the Delivery Phase.

Update 09 January 2020: The MC will not be required to self-perform the 5% Master Plan Feasibility Review phase.

Contractor appointment for the Delivery Phase is subject to all relevant Approvals, including Parliamentary Approval of the proposed works to proceed to construction and achieving Delivery Phase Agreement under the Contract with the Commonwealth.

:

THIS IS A NOTICE

None stated at this time.

Please refer to ATM at time of issue.

It is anticipated that the Building Code 2016 and Government policies in respect of Local Industry capability participation and Indigenous enterprise participation will apply to this project.

:

THIS IS A NOTICE

The estimated timeframe for delivery is as follows:

  • Managing Contractor Contract (MCC-1 2003) Award: Jun 20
  • 5% Master Plan Feasibility Review Non-Rejection: Sep 20
  • 30% Concept Design Report Non-Rejection: Feb 21
  • 50% Schematic Design Report Non-Rejection: Jun 21
  • 90% Detailed Design Report Non-Rejection: Sep 22
  • Delivery Phase Approval: Sep 22
  • Construction Commence: Mar 23
  • Construction Complete: Nov 25
  • End Defects Liability Period: Nov 26
Estimated Value (AUD):
From $220,000,000.00 to $260,000,000.00
:

None stated at this time.

Please refer to ATM at time of issue.

Contact Details

Project Manager / Contract Administrator

: +61 3 9948 2000

: